Excel London Exhibition Centre Monitoring

project start

February 1, 2023

Services

Construction Site Monitoring

Sensors

Tiltmeters
Detects angular variations with sub-milliradian resolution.
Gateway
Collects sensor data and transmits it to the cloud via LoRaWAN.

Excel London Exhibition Centre Monitoring

PROJECT OVERVIEW

ExCeL London, a premier exhibition and international convention center, embarked on an ambitious expansion project to add 25,000 square meters of high-end event space. The project, initiated in March 2022, demanded meticulous monitoring to safeguard the foundation stability during critical excavation and concreting phases.

sito_Tavola disegno 1-01

CHALLENGE

The construction strategy, devised by Gallagher Group, required phased excavation of foundation trenches, reinforced with robust steel braces before concrete pouring. Traditional monitoring methods posed significant safety risks and inefficiencies, necessitating an innovative approach.

SOLUTION IMPLEMENTATION

Survey Solutions, leveraging Move Solutions advanced technology, implemented a cutting-edge remote monitoring system. By outfitting the steel braces with 80 wireless tiltmeters, continuous, real-time data on any movements were captured and relayed to a central dashboard on MyMove IoT Platform, ensuring round-the-clock surveillance without endangering personnel.

The use of strong magnets for sensor attachment streamlined the installation process, providing flexibility for rapid adjustments in response to construction demands. This approach allowed for great responsiveness, with sensors being swiftly deployed or retracted to accommodate the dynamic construction schedule.

RESULTS

The remote monitoring system proved invaluable, offering constant vigilance over the foundation works. Live data feeds on MyMove IoT Platform and instant alerts for any threshold breaches enabled proactive management of potential issues, ensuring the project uninterrupted progress.  

The ExCeL London expansion structural monitoring exemplifies the synergy between technology innovation and construction expertise. Move Solutions hardware and software technology provided a foundation of confidence and security, showcasing the potential of remote monitoring in safeguarding complex construction works.

Other case studies

Bridge monitoring

Transforming bridge safety with real-time structural health monitoring in West Virginia

West Virginia is home to numerous bridges in need of closer oversight, with nearly 1 in 5 identified as requiring targeted structural improvements.

Huntington, USA

Read case study

Historic Buildings Monitoring

Monitoring a Historic Windmill Undergoing Repair Works

At the beginning of 2022, the SPAB and their Mills Section started a repair project at Kibworth Harcourt Mill, an outstanding historic post mill at Kibworth Harcourt in Leicestershire. Most of its structure dates back to 1711 or earlier and its interior is covered with graffiti of millers who worked there in the past. It is a Grade II listed building and a Scheduled Ancient Monument. Kibworth Mill is the last survivor out of the 211 post mills in Leicestershire, which makes it an important part of local and national milling heritage.

Leicestershire, UK

Read case study

Bridge Monitoring

Tilt and Vibration Monitoring of a Railway Bridge

The bridge located on the Scrivia river, one of the arteries of the homonymous valley, is a structure all about 160 meters long and is divided into 7 spans with lowered arches, in reinforced concrete. Built-in the early 1900s, it served as a road and rail bridge for years. In 1980 the extension of the bridge over the Scrivia (structure in reinforced concrete with slab and beams) was carried out and also a shift of the railway network to its own site, thus splitting the two uses. To monitor the health of the bridge, a wireless sensor network was installed consisting of DECK to monitor displacement and Triaxial Tiltmeter to monitor the inclination of the […]

Casella, Genoa, Italy

Read case study

Construction Site Monitoring

Monitoring a Construction Site to Provide Rail Access to the Depot

As part of the Transport for Wales rail system, a rolling stock depot was built at Taffs Well which required a bridge to connect it to the rail station. Before building the new bridge a sheet pile wall had to be installed in order to retain earth and other filling material during piling activities. The monitoring system provided by Move Solutions through one of their UK supplier, Korec Group, collects real-time data of the sheet pile wall, 24 hours a day, 7 days a week. The aim is to identify any changes in the behaviour and position of the wall so as to avoid structural failure after its removal.

Taff's Well, UK

Read case study