ExCeL London, a premier exhibition and international convention center, embarked on an ambitious expansion project to add 25,000 square meters of high-end event space. The project, initiated in March 2022, demanded meticulous monitoring to safeguard the foundation stability during critical excavation and concreting phases.

CHALLENGE
The construction strategy, devised by Gallagher Group, required phased excavation of foundation trenches, reinforced with robust steel braces before concrete pouring. Traditional monitoring methods posed significant safety risks and inefficiencies, necessitating an innovative approach.
SOLUTION IMPLEMENTATION
Survey Solutions, leveraging Move Solutions advanced technology, implemented a cutting-edge remote monitoring system. By outfitting the steel braces with 80 wireless tiltmeters, continuous, real-time data on any movements were captured and relayed to a central dashboard on MyMove IoT Platform, ensuring round-the-clock surveillance without endangering personnel.
The use of strong magnets for sensor attachment streamlined the installation process, providing flexibility for rapid adjustments in response to construction demands. This approach allowed for great responsiveness, with sensors being swiftly deployed or retracted to accommodate the dynamic construction schedule.
RESULTS
The remote monitoring system proved invaluable, offering constant vigilance over the foundation works. Live data feeds on MyMove IoT Platform and instant alerts for any threshold breaches enabled proactive management of potential issues, ensuring the project uninterrupted progress.
The ExCeL London expansion structural monitoring exemplifies the synergy between technology innovation and construction expertise. Move Solutions hardware and software technology provided a foundation of confidence and security, showcasing the potential of remote monitoring in safeguarding complex construction works.
Other case studies
Bridge Monitoring
Wireless Monitoring of the Zambeccari Bridge in Tuscany
The Zambeccari bridge in Pontremoli was built in the early 1900s on the Verde stream. It is a reinforced concrete bridge developed on two spans of the same length. In May 2020, the closure to both vehicular and pedestrian traffic is ordered for structural checks. The objective of the temporary closure of the structure is to clarify the state of health of the bridge and its structural degradation. After verifying the state of the Zambeccari bridge by the Vega Engineering Company, the structure was reopened with a reduced carriageway. Vega has prepared, with the approval of the municipality, the insertion of a continuous and remote structural monitoring system.
Pontremoli, Tuscany, Italy
Bridge Monitoring
Dynamic Monitoring of the Vespucci Bridge in Florence
The Vespucci bridge is one of the central bridges of Florence that allows you to join the San Frediano district to the rest of the city, separated by the Arno river. It is a structure in c.a.p. arch divided into 3 spans, with an overall length of 162m. Designed by Riccardo Morandi and built between 1954-1957, suffers from deterioration of the concrete, like many works of the time. This deterioration has affected the two piers even more markedly, especially the one on the left (San Frediano side) due to the erosion of the riverbed by the currents of the Arno river. This structural deterioration required continuous monitoring and safety works.
Florence, Italy
Bridge Monitoring
Tilt and Vibration Monitoring of a Railway Bridge
The bridge located on the Scrivia river, one of the arteries of the homonymous valley, is a structure all about 160 meters long and is divided into 7 spans with lowered arches, in reinforced concrete. Built-in the early 1900s, it served as a road and rail bridge for years. In 1980 the extension of the bridge over the Scrivia (structure in reinforced concrete with slab and beams) was carried out and also a shift of the railway network to its own site, thus splitting the two uses. To monitor the health of the bridge, a wireless sensor network was installed consisting of DECK to monitor displacement and Triaxial Tiltmeter to monitor the inclination of the […]
Casella, Genoa, Italy
Historic Buildings Monitoring
Monitoring a Historic Windmill Undergoing Repair Works
At the beginning of 2022, the SPAB and their Mills Section started a repair project at Kibworth Harcourt Mill, an outstanding historic post mill at Kibworth Harcourt in Leicestershire. Most of its structure dates back to 1711 or earlier and its interior is covered with graffiti of millers who worked there in the past. It is a Grade II listed building and a Scheduled Ancient Monument. Kibworth Mill is the last survivor out of the 211 post mills in Leicestershire, which makes it an important part of local and national milling heritage.
Leicestershire, UK