North York Moors Railway Monitoring

project start

December 18, 2023

Services

Railway and Landslip Monitoring

Sensors

Tiltmeters
Detects angular variations with sub-milliradian resolution.
Accelerometers
Measures high-resolution triaxial acceleration and frequencies for modal analysis.
Dynamic Displacement Sensor
Measures structural displacements with high sampling rates under dynamic loads.
Gateway
Collects sensor data and transmits it to the cloud via LoRaWAN.

North York Moors Railway Monitoring

PROJECT OVERVIEW

This project has was conducted by Academy Geomatics Ltd in collaboration with the North York Moors National Park Authority. The goal was to establish a comprehensive, real-time monitoring system to assess the behaviour of a landslip along the North Yorkshire Moors Railway, in order to ensure the safety and longevity of this crucial transportation link.  

OPTICAL OR GEOTECHNICAL SURVEYING?

Finding a suitable location for a total station proved challenging, as there wasn’t a spot that was both clear of the train tracks and had a view of the landslip. The valley offered limited stable ground for securing reference prisms. Moreover, the dense ferns and bracken, growing over a meter tall during summer, posed a risk of blocking the line of sight. Because of that, total station monitoring was considered unsuitable and was therefore decided to use Move Solutions wireless Tiltmeters.  

IMG_20240201_093230
IMG_0668
IMG_20240130_165435

SOLUTION IMPLEMENTATION

A series of 24 Tiltmeters were installed across three sets on 1.5m high metal poles, embedding them 1m deep into the ground.  

Mark Anderson, Director at Academy Geomatics Ltd, Move Solutions Technical Partner, also recommended the addition of sensors directly on the railway tracks due to the landslip potential impact, evidenced by a drainage ditch already being compromised by ground movement. Four Tiltmeters were positioned on the sleepers, complemented by four Accelerometers, for both static and dynamic assessments of the track. The modal analysis performed with the Accelerometers is crucial, as it helps identify issues with ballast voids or with broken culverts crossing under the track.  

In addition to Tiltmeters and Accelerometers, a Dynamic Displacement Sensor (DDS) was placed at the centre of the track area to gather more comprehensive data. Video monitoring, enabled by PTZ cameras, was integrated to correlate sensor data with visual observations, enhancing the overall monitoring strategy.

IMG_20240129_104330
IMG_20240130_161536
IMG_20240130_135821

CHALLENGES OVERCOME

The landslip and track monitoring faced challenges in terms of power and communication due to the remote location. A custom-made setup using solar panels, a wind turbine, and a special tower was created for reliable power, with carefully placed outdoor routers solving communication challenges. An additional Tiltmeter was then added to monitor the wind turbine.  

DCIM100MEDIADJI_0077.JPG
DCIM100MEDIADJI_0086.JPG
DCIM100MEDIADJI_0043.JPG

TIMELINE OF THE PROJECT

18-12-2023

Foundations dug, concrete poured, and tower bolt cage situated.  Landslip CCTV camera installed and ethernet cable run installed.

29-01-2024

Tower installed on bolt cage.  Solar panels installed on tower.  Tilt sensor locations set out on site.

30-01-2024  

Sensors installed in relevant locations.  Move Solutions gateway and CCTV camera installed on tower.  Equipment board and batteries installed on the tower. Communications equipment trailed at the top of tower. All equipment wired up.

01-02-2024  

Sensor locations accurately surveyed.  Communications equipment moved from the tower to the top of the escarpment.  Cable protected and dug into the ground.

13-02-2024  

Wind turbine installed and wired in.  Lidar and photogrammetric drone survey undertaken.

SENSORS INSTALLED

  • 24 Tiltmeters on the landslip
  • 4 Tiltmeters on the track
  • 1 Tiltmeter n the turbine tower  
  • 4 Accelerometers on the track  
  • 1 Dynamic Displacement Sensor on the track  
  • 1 Gateway on top of the tower  

PROJECT OUTCOMES

The project successfully established a real-time monitoring system capable of detecting both static and dynamic movements, providing invaluable insights into the structural health of the railway and the adjacent landslip. The data collected informs maintenance planning, enhances safety, and contributes to the long-term resilience of the railway infrastructure.

Other case studies

Bridge monitoring

Transforming bridge safety with real-time structural health monitoring in West Virginia

West Virginia is home to numerous bridges in need of closer oversight, with nearly 1 in 5 identified as requiring targeted structural improvements.

Huntington, USA

Read case study

Historic Buildings Monitoring

Monitoring a Historic Windmill Undergoing Repair Works

At the beginning of 2022, the SPAB and their Mills Section started a repair project at Kibworth Harcourt Mill, an outstanding historic post mill at Kibworth Harcourt in Leicestershire. Most of its structure dates back to 1711 or earlier and its interior is covered with graffiti of millers who worked there in the past. It is a Grade II listed building and a Scheduled Ancient Monument. Kibworth Mill is the last survivor out of the 211 post mills in Leicestershire, which makes it an important part of local and national milling heritage.

Leicestershire, UK

Read case study

Bridge Monitoring

Tilt and Vibration Monitoring of a Railway Bridge

The bridge located on the Scrivia river, one of the arteries of the homonymous valley, is a structure all about 160 meters long and is divided into 7 spans with lowered arches, in reinforced concrete. Built-in the early 1900s, it served as a road and rail bridge for years. In 1980 the extension of the bridge over the Scrivia (structure in reinforced concrete with slab and beams) was carried out and also a shift of the railway network to its own site, thus splitting the two uses. To monitor the health of the bridge, a wireless sensor network was installed consisting of DECK to monitor displacement and Triaxial Tiltmeter to monitor the inclination of the […]

Casella, Genoa, Italy

Read case study

Construction Site Monitoring

Monitoring a Construction Site to Provide Rail Access to the Depot

As part of the Transport for Wales rail system, a rolling stock depot was built at Taffs Well which required a bridge to connect it to the rail station. Before building the new bridge a sheet pile wall had to be installed in order to retain earth and other filling material during piling activities. The monitoring system provided by Move Solutions through one of their UK supplier, Korec Group, collects real-time data of the sheet pile wall, 24 hours a day, 7 days a week. The aim is to identify any changes in the behaviour and position of the wall so as to avoid structural failure after its removal.