Esk Wharf, Whitby, England

Static-Dynamic SHM and Water Monitoring for Quay Wall Safety

project start

March 27, 2023

Sensors

Tiltmeter
Detects angular variations with sub-milliradian resolution.
Vibrometer
Captures triaxial vibration velocity and dominant frequency.
Gateway
Collects sensor data via LoRaWAN and transmits it to the cloud via cellular.
Communication Node
Connects and digitizes third-party analog sensors.

Static-Dynamic SHM and Water Monitoring for Quay Wall Safety

Overview

In August 2022, Academy Geomatics Ltd started conducting automated monitoring with a total station and prism for a local council. There were concerns that the quay wall might had been moving and the monitoring was aimed at verifying that. Since day trips to monitor the wall were not a long enough period of time to attest the consequences of the tidal effect on the wall, it was proposed to set up an automated total station and leave it there 24/7 for a month, receiving data every 5 minutes to accurately show the tidal effect on the structure.  

Thanks to this monitoring system, it was possible to analyse the tidal effect on the quay wall, and to collect partial measurements of the quay wall movement caused by the change in water level. However, as the wall was shown to be moving, the council decided to continue the monitoring to be able to act promptly in case peaks of data were detected.  

As good as the automated total station was, it had some flaws on this site, which were known at the start, but since the duration of the monitoring project was initially only planned to last 1 month, they were considered acceptable. One of the problems was the inter-visibility between the total station and the monitoring prisms that was interrupted depending on the tide level and the number of boats moored up against the quay wall.  

Monitoring System

As it was then required a longer-term monitoring, Academy Geomatics proposed a system of 16 Tiltmeters and 4 Vibrometers as a better way of monitoring they quay wall, especially considering that the area the council was most concerned about was permanently obscured by a floating dry dock.  

The installation took place on 27/03/23. The sensors were bolted to a metal plate and then the metal plate was ‘tek screwed’ to the metal sheet pile. That allows for easy removal and or replacement of the sensor in due course. An ultrasonic water level detector was also installed, wired to an analog node, so as to receive information about the water level and verify whether the movements of the quay wall were due to that or to the temperature.  

Two CCTV cameras were also installed at the location, one to view the top of the quay and one view along the quay wall, in order to promptly verify whether any of the tilt movements or vibrational results detected could be connected to site activities.  

Monitoring project

The image below shows the data collected by the Tiltmeters and showed on MyMove IoT Platform where algorithms analyse the evolving tilts of the quay wall in relation to the river’s water level. Notably, at T06, a significant shift is observed as the sensor moves within proximity to the river. However, this movement is abruptly halted by a restraining bolt situated lower on the wall. This occurrence not only serves as an indication of structural displacement but also suggests a deficiency in the proper functionality of the restraining system.

Tidal movement data collected by Tiltmeters

Regarding the data collected by the Vibrometers, vibrations surpassing the threshold of 1 mm/s are primarily observed on days when construction work is being conducted, while during the Easter period there appears to be a significant reduction in vibrational activity.

Vibrational data collected by a Vibrometer

The presented water level data provides information regarding the fluctuations in water levels over time. The anomaly observed indicates a deviation in the data caused by a rope from a nearby boat.  

Water level data collected by a water level detector

Monitoring project

Data was closely monitored during a crane construction and quay loading. The initial plan entailed lifting the boat and subsequently dismantling the crane. Contrary to expectations, it was observed that the quay wall remained remarkably stable during the boat lift, even with the utilization of a massive crane. This achievement could be attributed to the exceptional efforts of the crane operators in effectively isolating the front section of the quay wall.

The image depicts three cranes positioned at the construction site, preparing to raise the orange boat on the right side and place it into the water. The crane situated on the left is a typical wharf crane commonly used for such operations. The middle crane has been brought to the site specifically to facilitate the construction of the large crane. Finally, the yellow crane on the right is an exceedingly large machine with a lifting capacity of 600 tons, intended for the task of hoisting the boat into the water.

Esk-Wharf

No items found.

Other case studies

Bridges

Bridge of the Gods: wireless structural health monitoring for a historic Columbia River crossing

Discover how Move Solutions and Parsons deployed a wireless structural health monitoring system on the Bridge of the Gods in Oregon, capturing real-time data on stress, vibration, and movement to protect and extend the life of this historic Columbia River crossing, an early but crucial step toward ensuring its safety, resilience, and preservation for decades to come.

Cascade Locks, Oregon (US)

Read case study
Buildings and heritage sites

Basilica of Saint Francis of Assisi – Structural monitoring during construction

Move Solutions deployed a structural health monitoring system to allow monitoring of vibrations and rotations in the Basilica of San Francesco during the construction of a new connecting gallery and elevator, protecting Giotto’s frescoes.

Basilica of Saint Francis of Assisi

Read case study
Bridges

Transforming bridge safety with real-time structural health monitoring in West Virginia

Wireless sensors and a real-time monitoring platform provide continuous insight into the bridge’s dynamic behavior, helping engineers assess structural performance, reduce special inspections, and support more efficient maintenance decisions.

Huntington, USA

Read case study
Bridges

Wireless Monitoring of the Zambeccari Bridge in Tuscany

The Zambeccari bridge in Pontremoli was built in the early 1900s on the Verde stream. It is a reinforced concrete bridge developed on two spans of the same length. In May 2020, the closure to both vehicular and pedestrian traffic is ordered for structural checks. The objective of the temporary closure of the structure is to clarify the state of health of the bridge and its structural degradation. After verifying the state of the Zambeccari bridge by the Vega Engineering Company, the structure was reopened with a reduced carriageway. Vega has prepared, with the approval of the municipality, the insertion of a continuous and remote structural monitoring system.

Pontremoli, Tuscany, Italy

Read case study