Overview
The bridge located on the Scrivia river, one of the arteries of the homonymous valley, is a structure all about 160 meters long and is divided into 7 spans with lowered arches, in reinforced concrete. Built in the early 1900s, it served as a road and rail bridge for years. In 1980 the extension of the bridge over the Scrivia (structure in reinforced concrete with slab and beams) was carried out and also a shift of the railway network to its own site, thus splitting the two uses.
To monitor the health of the bridge, a wireless sensor network was installed consisting of Dynamic Displacement Sensors (DDS) to monitor displacement and Tiltmeters to monitor the inclination of the structure. DDS sensors were installed on the intrados of the arch and also on the piles, to record all the dynamic events caused by the passage of the train at high speeds. The Triaxial Tiltmeters were installed in strategic points of the structure to monitor the presence or absence of inclinations. Effects due to temperature such as seasonality were excluded from this analysis of static movements.

Other projects
Bridge of the Gods: wireless structural health monitoring for a historic Columbia River crossing
At-Turaif world heritage site – Environmental and structural monitoring for preservation
Basilica of Saint Francis of Assisi – Structural monitoring during construction
Transforming bridge safety with real-time structural health monitoring in West Virginia
Subscribe to Updates
Stay informed about our latest innovations and insights.