PROJECT OVERVIEW
On the 6th of February 2023, a magnitude 7.8 earthquake occurred in southern Turkey near the northern border of Syria. This event was followed approximately nine hours later by a magnitude 7.5 quake located around 95 kilometers (59 miles) to the southwest.
The first earthquake was the most devastating to hit earthquake-prone Turkey in over 20 years and it was as strong as one in 1939, the most powerful recorded there. It has its centre near Gaziantep in south-central Turkey, home to thousands of Syrian refugees and the many humanitarian aid organizations also based there.
There have been 50,783 deaths, 297 missing and 107,204 injured across 11 of the 17 affected provinces of Turkey. At least 15.73 million people and 4 million buildings have been affected. About 345,000 apartments have been destroyed.
The community has been left in a state of vulnerability, unsure whether or not to return to their homes, schools, hospitals…
To bring them some support in this critical situation, Emmanuel Durand partnered with Move Solutions, who donated the necessary sensors for the project to monitor and analyze the structural conditions of two hospitals and a large student residence after the earthquake. That enabled the collection of valuable data for post-earthquake analysis and facilitated the return of people to these essential facilities.
MONITORING SYSTEM
Wireless tiltmeters were employed to measure inclination and detect any potential shifts in the buildings’ orientations. Wireless accelerometers were used to capture dynamic responses and vibrations induced by external forces or structural instability. The gateway served as the central data hub, collecting, analyzing, and transmitting data to the cloud-based software platform.



MONITORING PROJECT – DATA COLLECTION
The sensors were strategically installed at critical locations to ensure comprehensive data collection. The tiltmeters were positioned to detect even subtle inclinations, while the accelerometers were deployed to monitor vibrations and oscillations in real-time. Move Solutions’ cloud-based software platform facilitated remote data visualization, trend analysis, and real-time alerts. The collected data was processed, allowing Emmanuel Durand and the project team to monitor the structural behavior of the buildings remotely, assess the impact of the earthquake, and identify potential areas of concern.
CONCLUSION
The collaboration between Emmanuel Durand and Move Solutions allowed to gain crucial insights into the structural health of the hospitals and the student residence. This data-driven approach helped to instil confidence among the building staff, enabling them to return to their work safely.
The monitoring project also demonstrated the immense value of structural health monitoring in the post-earthquake scenario. The collaboration between Emmanuel Durand and Move Solutions exemplifies the positive impact that technology can have on building resilience and safety.
Other case studies
Bridge Monitoring
Wireless Monitoring of the Zambeccari Bridge in Tuscany
The Zambeccari bridge in Pontremoli was built in the early 1900s on the Verde stream. It is a reinforced concrete bridge developed on two spans of the same length. In May 2020, the closure to both vehicular and pedestrian traffic is ordered for structural checks. The objective of the temporary closure of the structure is to clarify the state of health of the bridge and its structural degradation. After verifying the state of the Zambeccari bridge by the Vega Engineering Company, the structure was reopened with a reduced carriageway. Vega has prepared, with the approval of the municipality, the insertion of a continuous and remote structural monitoring system.
Pontremoli, Tuscany, Italy
Bridge Monitoring
Dynamic Monitoring of the Vespucci Bridge in Florence
The Vespucci bridge is one of the central bridges of Florence that allows you to join the San Frediano district to the rest of the city, separated by the Arno river. It is a structure in c.a.p. arch divided into 3 spans, with an overall length of 162m. Designed by Riccardo Morandi and built between 1954-1957, suffers from deterioration of the concrete, like many works of the time. This deterioration has affected the two piers even more markedly, especially the one on the left (San Frediano side) due to the erosion of the riverbed by the currents of the Arno river. This structural deterioration required continuous monitoring and safety works.
Florence, Italy
Bridge Monitoring
Tilt and Vibration Monitoring of a Railway Bridge
The bridge located on the Scrivia river, one of the arteries of the homonymous valley, is a structure all about 160 meters long and is divided into 7 spans with lowered arches, in reinforced concrete. Built-in the early 1900s, it served as a road and rail bridge for years. In 1980 the extension of the bridge over the Scrivia (structure in reinforced concrete with slab and beams) was carried out and also a shift of the railway network to its own site, thus splitting the two uses. To monitor the health of the bridge, a wireless sensor network was installed consisting of DECK to monitor displacement and Triaxial Tiltmeter to monitor the inclination of the […]
Casella, Genoa, Italy
Historic Buildings Monitoring
Monitoring a Historic Windmill Undergoing Repair Works
At the beginning of 2022, the SPAB and their Mills Section started a repair project at Kibworth Harcourt Mill, an outstanding historic post mill at Kibworth Harcourt in Leicestershire. Most of its structure dates back to 1711 or earlier and its interior is covered with graffiti of millers who worked there in the past. It is a Grade II listed building and a Scheduled Ancient Monument. Kibworth Mill is the last survivor out of the 211 post mills in Leicestershire, which makes it an important part of local and national milling heritage.
Leicestershire, UK