PROJECT OVERVIEW
The sensors system provided live 24/7 monitoring data so as to keep the tunnels of Newcastle’s Metro and the train users safe during extensive above ground construction work.
The Pilgrim’s Quarter project, part of the new £155m HMRC headquarters in Newcastle, is the biggest office development in Newcastle City Centre’s history and is located very close to the underground Metro tunnels in the area. Whilst construction is scheduled to run for 2 years, Nexus (owners of the Metro tunnels and operators of the Metro trains) requested to have the affected tunnels monitored during the project and for an additional year after completion. Academy Geomatics Ltd, specialists in monitoring applications, were asked by Cundall / Bowmer and Kirkland to propose a monitoring system for both the Metro running tunnel and the ventilation tunnel running alongside.

PREPARATION
Before proposing a monitoring system, Academy Geomatics Ltd, under the guidance of Director Mark Anderson, conducted an initial topographical survey in 2021 of the tunnels to relate their location to a previous survey at ground level. A control traverse was conducted between the two nearest stations which also linked up with two previous Academy surveys of the Metro stations. The lines of the tunnels were measured in outline until the area of interest was reached. The area was also laser scanned to provide the 3D information needed to produce the drawings, give a representation of the tunnels’ current condition and allow for the 3D design of the monitoring scheme.
MONITORING SYSTEM
It was decided that within the running tunnel, where 155m of tunnel needed monitoring, an automated total station system would be installed. The tunnel length was divided up into eighteen sections which corresponded with the location of an adjacent pile on the site. Five monitoring prisms were placed around the cross section to show if one side of the tunnel moved more than the other. As the ventilation tunnel offered no lines of site to use an automated total station, tilt sensors were deemed to be the most logical tool. The 28m long ventilation tunnel was divided up into 3 cross sections and 3 Tiltmeters per cross section were installed. Each cross section had varied influence from the construction site and the Tiltmeters on either side of the tunnel also experience different influences from the site. Therefore, it was easy to see any changes in deformation by work on the site.
An accelerometer sensor was installed at either end of the ventilation tunnel, to take advantage of the modal analysis and FDD functions of the MyMove IoT Platform.
“Another draw with the Move Solutions kit is the Cloud Platform, which is far better than any other we have used. The customisable dashboard is a big plus” – Mark Anderson, Director, Academy Geomatics Ltd.
Two Accelerometers were also installed within the running tunnel. A Vibrometer was installed in the ventilation tunnel and in the running tunnel to maximise the usefulness of the system by changing the static monitoring to a dynamic monitoring system.

All the equipment took a week of night shifts to install, setup and configure in July 2022. Various analysis charts were configured for the client, automated alarms and reporting were configured to give maximum confidence that the site work is not affecting the running and ventilation tunnel. The dynamic monitoring data has been reviewed by Academy Geomatics Ltd staff on a daily basis, looking for trends, changes in trends etc.
Following the successful installation of this scheme, Bowmer and Kirkland contracted Academy Geomatics Ltd also undertake the monitoring of the Carliol House façade nearby, using Move Solutions Tilmeters.







Other case studies
Bridge Monitoring
Wireless Monitoring of the Zambeccari Bridge in Tuscany
The Zambeccari bridge in Pontremoli was built in the early 1900s on the Verde stream. It is a reinforced concrete bridge developed on two spans of the same length. In May 2020, the closure to both vehicular and pedestrian traffic is ordered for structural checks. The objective of the temporary closure of the structure is to clarify the state of health of the bridge and its structural degradation. After verifying the state of the Zambeccari bridge by the Vega Engineering Company, the structure was reopened with a reduced carriageway. Vega has prepared, with the approval of the municipality, the insertion of a continuous and remote structural monitoring system.
Pontremoli, Tuscany, Italy
Bridge Monitoring
Dynamic Monitoring of the Vespucci Bridge in Florence
The Vespucci bridge is one of the central bridges of Florence that allows you to join the San Frediano district to the rest of the city, separated by the Arno river. It is a structure in c.a.p. arch divided into 3 spans, with an overall length of 162m. Designed by Riccardo Morandi and built between 1954-1957, suffers from deterioration of the concrete, like many works of the time. This deterioration has affected the two piers even more markedly, especially the one on the left (San Frediano side) due to the erosion of the riverbed by the currents of the Arno river. This structural deterioration required continuous monitoring and safety works.
Florence, Italy
Bridge Monitoring
Tilt and Vibration Monitoring of a Railway Bridge
The bridge located on the Scrivia river, one of the arteries of the homonymous valley, is a structure all about 160 meters long and is divided into 7 spans with lowered arches, in reinforced concrete. Built-in the early 1900s, it served as a road and rail bridge for years. In 1980 the extension of the bridge over the Scrivia (structure in reinforced concrete with slab and beams) was carried out and also a shift of the railway network to its own site, thus splitting the two uses. To monitor the health of the bridge, a wireless sensor network was installed consisting of DECK to monitor displacement and Triaxial Tiltmeter to monitor the inclination of the […]
Casella, Genoa, Italy
Historic Buildings Monitoring
Monitoring a Historic Windmill Undergoing Repair Works
At the beginning of 2022, the SPAB and their Mills Section started a repair project at Kibworth Harcourt Mill, an outstanding historic post mill at Kibworth Harcourt in Leicestershire. Most of its structure dates back to 1711 or earlier and its interior is covered with graffiti of millers who worked there in the past. It is a Grade II listed building and a Scheduled Ancient Monument. Kibworth Mill is the last survivor out of the 211 post mills in Leicestershire, which makes it an important part of local and national milling heritage.
Leicestershire, UK