24/7 Dynamic Monitoring of a Metro Tunnel

Overview

The sensors system provided live 24/7 monitoring data so as to keep the tunnels of Newcastle’s Metro and the train users safe during extensive above ground construction work.

The Pilgrim’s Quarter project, part of the new £155m HMRC headquarters in Newcastle, is the biggest office development in Newcastle City Centre’s history and is located very close to the underground Metro tunnels in the area. Whilst construction is scheduled to run for 2 years, Nexus (owners of the Metro tunnels and operators of the Metro trains) requested to have the affected tunnels monitored during the project and for an additional year after completion. Academy Geomatics Ltd, specialists in monitoring applications, were asked by Cundall / Bowmer and Kirkland to propose a monitoring system for both the Metro running tunnel and the ventilation tunnel running alongside.

Academy Geomatics Ltd

Preparation

Before proposing a monitoring system, Academy Geomatics Ltd, under the guidance of Director Mark Anderson, conducted an initial topographical survey in 2021 of the tunnels to relate their location to a previous survey at ground level. A control traverse was conducted between the two nearest stations which also linked up with two previous Academy surveys of the Metro stations. The lines of the tunnels were measured in outline until the area of interest was reached. The area was also laser scanned to provide the 3D information needed to produce the drawings, give a representation of the tunnels’ current condition and allow for the 3D design of the monitoring scheme.

Monitoring system

It was decided that within the running tunnel, where 155m of tunnel needed monitoring, an automated total station system would be installed. The tunnel length was divided up into eighteen sections which corresponded with the location of an adjacent pile on the site. Five monitoring prisms were placed around the cross section to show if one side of the tunnel moved more than the other. As the ventilation tunnel offered no lines of site to use an automated total station, Tiltmeters were deemed to be the most logical tool. The 28m long ventilation tunnel was divided up into 3 cross sections and 3 Tiltmeters per cross section were installed. Each cross section had varied influence from the construction site and the Tiltmeters on either side of the tunnel also experience different influences from the site. Therefore, it was easy to see any changes in deformation by work on the site.  

An accelerometer sensor was installed at either end of the ventilation tunnel, to take advantage of the modal analysis and FDD functions of the MyMove IoT Platform.  

Another draw with the Move Solutions kit is the Cloud Platform, which is far better than any other we have used. The customisable dashboard is a big plus” – Mark Anderson, Director, Academy Geomatics Ltd.

Two Accelerometers were also installed within the running tunnel. A Vibrometer was installed in the ventilation tunnel and in the running tunnel to maximise the usefulness of the system by changing the static monitoring to a dynamic monitoring system.  

All the equipment took a week of night shifts to install, setup and configure in July 2022. Various analysis charts were configured for the client, automated alarms and reporting were configured to give maximum confidence that the site work is not affecting the running and ventilation tunnel. The dynamic monitoring data has been reviewed by Academy Geomatics Ltd staff on a daily basis, looking for trends, changes in trends etc.

Following the successful installation of this scheme, Bowmer and Kirkland contracted Academy Geomatics Ltd also undertake the monitoring of the Carliol House façade nearby, using Move Solutions Tilmeters.

Other case studies

Bridges

Bridge of the Gods: wireless structural health monitoring for a historic Columbia River crossing

Discover how Move Solutions and Parsons deployed a wireless structural health monitoring system on the Bridge of the Gods in Oregon, capturing real-time data on stress, vibration, and movement to protect and extend the life of this historic Columbia River crossing, an early but crucial step toward ensuring its safety, resilience, and preservation for decades to come.

Cascade Locks, Oregon (US)

Read case study
Buildings and heritage sites

Basilica of Saint Francis of Assisi – Structural monitoring during construction

Move Solutions deployed a structural health monitoring system to allow monitoring of vibrations and rotations in the Basilica of San Francesco during the construction of a new connecting gallery and elevator, protecting Giotto’s frescoes.

Basilica of Saint Francis of Assisi

Read case study
Bridges

Transforming bridge safety with real-time structural health monitoring in West Virginia

Wireless sensors and a real-time monitoring platform provide continuous insight into the bridge’s dynamic behavior, helping engineers assess structural performance, reduce special inspections, and support more efficient maintenance decisions.

Huntington, USA

Read case study
Bridges

Wireless Monitoring of the Zambeccari Bridge in Tuscany

The Zambeccari bridge in Pontremoli was built in the early 1900s on the Verde stream. It is a reinforced concrete bridge developed on two spans of the same length. In May 2020, the closure to both vehicular and pedestrian traffic is ordered for structural checks. The objective of the temporary closure of the structure is to clarify the state of health of the bridge and its structural degradation. After verifying the state of the Zambeccari bridge by the Vega Engineering Company, the structure was reopened with a reduced carriageway. Vega has prepared, with the approval of the municipality, the insertion of a continuous and remote structural monitoring system.

Pontremoli, Tuscany, Italy

Read case study